Dong Hung Footwear Innovation

Manufacturing

Production engineered for repeatable quality.

Cutting, stitching, lasting, assembly, finishing, inspection and packing connected across the group.

Footwear production line at Dong Hung Footwear Group
Production lines at Dong Hung Footwear Group

Gates 07–08

From approved sample to shipped finished goods.

Once a style is confirmed in development, the same programme continues here: material readiness, line allocation, in-process control, final inspection, packing and shipment coordination.

See quality control

08

Production lines

5M

Pairs per year capacity

03

Construction families

1992

Footwear operations

More than 35 years of footwear manufacturing

08 lines

Operating capacity

8 lasting lines with 3,200 workers

09 lines

Design capacity

Designed for 9 lasting lines with 5,000 workers

5M

Annual capacity

Published group capacity in pairs per year

Facilities

Three companies, two provinces.

Manufacturing facility of Dong Hung Footwear Group

Dong Hung Industry JSC

2007

Tan Dong Hiep A Industrial Park, Di An, Binh Duong

Fashion, vulcanised and semi-athletic footwear - design, production and sale.

Hiep Tri Shoes - Factory 2

1999

Linh Trung Ward, Thu Duc, Ho Chi Minh City

Production and export of women's fashion footwear.

Hiep Tri Shoes - Factory 3

2005

Linh Trung Ward, Thu Duc, Ho Chi Minh City

Design, production and sale of product (ODM).

Three separate workflows

Sampling, production and inspection are clearly separated.

Each workflow has its own starting point, stages and output; open it to review the detailed steps.

01

Sample development

R&D and sampling workflow

A separate development path from first customer information to the sealed confirmation sample.

  1. 01R&D contact
  2. 02Customer information
  3. 03Technical review
  4. 04Initial development sample

02

Production

Manufacturing workflow

A separate production path from quality preparation through cutting, decoration, stitching, lasting, finishing and packing.

  1. 01QA preparation
  2. 02Production planning
  3. 03Material receiving
  4. 04Cutting

03

Inspection

Quality inspection workflow

A separate inspection path from incoming materials to in-line control and final AQL inspection.

  1. 01Incoming materials
  2. 02In-line inspection
  3. 03First-article approval
  4. 04Final inspection

Supporting structure

Components, logistics and trading held inside the group.

01

Footwear Manufacturing

Fashion, vulcanised and semi-athletic footwear.

02

Footwear Supporting Industries

Component capability held inside the group.

03

Logistics

Packing, documentation and export shipment in-house.

04

Trading & Services

Commercial structures beyond straight OEM.

Bring us a style. We will show you how it runs on the line.