Quality
Control where it changes the outcome.
Quality at Dong Hung is a sequence of gates from material intake to final inspection, with every finding routed back into the process that produced it.


Across every gate
Control points sit inside the programme, not after it.
Incoming material control, in-line checkpoints, confirmation-sample reference and final random inspection all feed corrective action back into development and production.
Discuss your standardsControl points
Five gates between material intake and the container.
Incoming material control
Leather, textile, lining, components and soles checked against the approved material board before they reach the cutting room.
First-article approval
The first shoes off the line are measured against the confirmation sample before the style is released to full output.
In-line checkpoints
Cutting, stitching, lasting and finishing carry their own checkpoints, so defects are caught at the operation that created them.
Final random inspection
Finished cartons inspected on an agreed sampling plan before packing and export documentation are closed.
Corrective action
Findings are fed back into engineering and development so the same defect does not return in the next production run.

Standards
Quality documentation aligned to your programme.
Standards, testing protocols and documentation are reviewed directly with your quality and compliance teams for each product and target market.
Programme-defined
Quality requirements
Reviewed with your team
Compliance documentation
Market-specific
Chemical requirements
Construction-specific
Physical testing
